Dana Point Nursery: Wallpaper Above the Chair Rail and Deep Mauve Below, Done in 3 Days
By Breno GarretWe wallpapered a Dana Point nursery, painted the lower wall Deep Mauve, painted a second bedroom in Sea Salt, and were out in 3 days, before the baby came home.

5 Star Rated on Google
Licensed & Insured
Family Owned & Operated
Founded by a French-certified painter
We finished a nursery and a second bedroom in a Dana Point home in 3 days, while the client was in the hospital having her baby. The nursery has botanical wallpaper above the chair rail and Benjamin Moore Deep Mauve 1265 below it. The second bedroom and its doors are Sherwin-Williams Sea Salt SW 6204. We worked on this project with designer Elspeth Scott of Keller Scott Studio.

The Plan for the Nursery
The room already had a chair rail, so we used it as the line between two finishes. Above the rail we hung Joules Midnight Beasts wallpaper, a light botanical print with ferns and small animals. Below the rail we painted the wall in Deep Mauve, a rich rose with a brown undertone that picks up the darker tones in the paper.
Splitting the wall this way gives a nursery color without making the room feel small. The lower wall also takes most of the bumps and fingerprints as a child grows, and paint is easy to touch up later.
How We Painted Deep Mauve
Deep Mauve is a deep color, so we started with a primer tinted toward the finish color. A tinted primer gives the color an even base and helps it cover in two finish coats. For the finish coats we used a low VOC paint, because this is a baby's room and the family was coming home right after the job.
The Sea Salt Bedroom and Doors
Sea Salt SW 6204 is a soft green gray that changes with the light during the day. We painted the second bedroom walls and the doors in Sea Salt. We sprayed the doors instead of brushing them, which gives a smooth finish with no brush marks.

Working Around a New Baby
The client went into the hospital to have her baby the same week we were scheduled to start. We kept the schedule and planned the job so the house would be ready for her return.
- We covered every floor and surface before we opened a can.
- We sprayed the doors so they would be smooth and done fast.
- We finished both rooms and were out of the house in 3 days.
When a family is about to bring a baby home, the timeline matters as much as the finish. We plan the order of work around that date.
Working With a Designer
Elspeth Scott chose the wallpaper and the colors, and we handled the install and the paint. When a designer is on the project, we follow the design plan and keep the designer updated as the work moves. You can see more about how we work with designers on our designers and builders page.
Questions Homeowners Ask Us
Can you wallpaper above a chair rail and paint below it?
Yes. A chair rail is a natural line to split two finishes. We paint the lower wall and hang the paper above, so the rail covers the joint and the room looks finished.
Do deep colors need a primer?
Deep colors cover better over a tinted primer. On this job we used a primer tinted toward Deep Mauve, then two finish coats.
How long does a nursery take?
This nursery and a second bedroom with its doors took 3 days. Your timeline depends on the size of the room, the wallpaper, and the condition of the walls.
Do you install wallpaper the client already bought?
Yes. Many of our clients or their designers order the paper, and we install it. See our wallpaper installation in Orange County and interior painting pages for more.
Schedule your free estimate or call (949) 381-1555.

FAQs
Can you wallpaper above a chair rail and paint below it?
Yes. A chair rail is a natural line between two finishes. We paint the lower wall and hang the wallpaper above so the rail covers the joint.
Do deep paint colors like Deep Mauve need a primer?
Deep colors cover better over a primer tinted toward the finish color. On this Dana Point nursery we used a tinted primer, then two low VOC finish coats.
How long does it take to wallpaper and paint a nursery?
This Dana Point nursery and a second bedroom with its doors took 3 days. The timeline depends on room size, the wallpaper, and wall condition.


